KPlus in Motion

Real projects. Real crews. No stock photos — this is recent KPM work, photographed on our job sites across the Midwest.

Wash SystemsPump RoomsTerminalsTank Change-Outs

Project 01

Fleet Wash Bay — Ground-Up Build

Structural gantriesStainless pipingBrush systemsChemical feed

A complete drive-through wash lane for a large-vehicle fleet — KPM crews erected the gantry structures, ran the overhead stainless supply piping, set the brush systems, and built the chemical feed room that drives it all.

Rows of wash gantry structures erected in the new wash building
Brush system installation in the wash lane
Overhead stainless piping grid for the wash system

Project 02

Chemical Feed & Pump Systems

Poly storage tanksMultistage pumpsDosing & controlsFiltration

Behind every wash lane and process system is a pump room that has to run every day. KPM built this one out complete — chemical storage, vertical multistage pumps, dosing systems, and the piping and controls between them.

Chemical storage tank and pump room built by KPM
Vertical multistage pump installed with piping and isolation valves
Tank agitator and flanged connection detail

Project 03

Terminal & Tank Farm Operations

Bulk storageLoading canopyRail & truck loadoutYear-round service

Winter doesn't wait, and neither do terminals. KPM supports bulk storage and loadout facilities through every season — silos, canopies, transfer systems, and the mechanical work that keeps product moving.

Truck loadout canopy and storage silo at an operating terminal
Terminal yard with silos and loading infrastructure in winter
Storage silos and loading canopy at a bulk terminal

Project 04

Underground Tank Change-Out

Excavation & shoringTank removalNew tank setBackfill & restore

Old steel out, new tank in — with the excavation, shoring, dewatering, and backfill handled safely in an active facility. This is the full-scope change-out work KPM delivers from first dig to final restore.

Excavator lifting an old underground storage tank from the excavation
New fiberglass tank being lifted for placement
KPM crew backfilling the tank excavation with crane support

Want This Kind of Work on Your Site?

Every project above started with a site walk and a conversation. Explore the services behind the work — or skip straight to the conversation.

Put KPM in Motion on Your Project

Tell us what you're planning — we'll bring the crew, the equipment, and the follow-through you just saw.